• NeoDB
  • Explore
  • Feed
  • Home
    • Scan barcode
    • Sign up or login
    • Preferences
9yr 黑
cover

Book

The Generation of Power
Douban
Anne D. Rassweiler publishing house: Oxford University Press 1988 - 11
Dneprostroi, a dam and power plant that was one of the most monumental construction projects of the Bolshevik's First Five Year Plan, was a milestone in American-Soviet co-operation. As the largest earth dam in Europe in the 1930s, it represented the first of the giant projects so favoured by Stalin. Anne Rassweiler's informative history of this project reveals new aspects of the struggle between Trotsky and Stalin, the debate on the use of foreign technology, and the effects of collectivization on the industrial projects of the First Five Year Plan. Her study also provides insight into the entry of women into the industrial work force and interaction between party leaders, party membership, and enterprise officials as they sought to realize one of the most ambitious projects in Soviet history.

想读《The Generation of Power》

黑
@nostos7@neodb.social
39 following  ·  13 followers

“一步两步 一步两步
一步一步似爪牙
似魔鬼的步伐
似魔鬼的步伐”

“层楼终究误少年 自由早晚乱余生”

悼念范轶然博士。1990-2021



关注我们建议反馈站点公约 About API Apps
You are visiting an alternative domain for NeoDB, please always use original version if possible.